Wind energy powers the economy

Demag DS10-Wind rope winch

For swift service in wind turbine installations

When maintenance work needs to be carried out on wind turbines, the spare parts and tools have to be lifted on the outside up to the nacelle to heights of 100 meters or more. For onshore and offshore installations we offer cranes, rope and chain hoists that are specially designed to meet the needs of the wind power industry.

Demag hoists ensure fast, convenient and reliable service procedures and minimize the time required to transport material. They help to ensure that facility downtimes are cut to a minimum and to boost the efficiency of these installations. Many companies in the wind power industry also employ our technologies to manufacture their wind turbines.

Convenient operation

  • Fast main lifting and precise creep lifting motions
  • Ergonomic and fatigue-free handling
  • Compact dimensions due to low-headroom trolley design
  • Unrestricted view of the working area thanks to large chain collector bag
  • No damage to the inner or outer surface of the tower caused by lifting motions thanks to a protective sleeve on the hook assembly (optional)
  • Simple movement on I-beam girders or in the KBK system for horizontal transport of loads within the nacelle
  • Even more convenient movement thanks to optional handles
  • Cyclic duration factor up to 100% enables efficient operation even at large lifting heights
  • Slipping clutch for overload protection

Contato

Demag contact

Demag Cranes & Components GmbH

Postfach 67
58286 Wetter
Germany

Telefone:
+49 (0) 2335 92-0
Fax:
+49 (0) 2335 92-7676

Video Showcase

Product details

Demag DS10-Wind rope winch

DS10 Wind
1. HOOK PATH
  • The Demag DS10-Wind rope winch with hook paths of up to 180 m is a reliable hoist in wind turbines
2. PARKING POSITION
  • Locking devices for safe parking when not in use or at specific operating points
  • Trolley can be secured against unintentional movement caused by motions of the wind turbine
  • Additional compensation mechanism also for horizontal retention of the hoist unit
3. CONTROL SYSTEM
  • Optimum handling thanks to compact, ergonomic control pendant and flexible control cable
4. LIMIT SWITCHES
  • Reliable stop: operating limit switch for the highest hook position
  • Compensation for rope elongation
5. ROPE GUIDE
  • Rope wound in multiple layers – diamond screw spindle ensures that the rope is guided correctly
  • The rope is carefully wound in up to four layers
  • Extremely precise horizontal positioning of the rope along the drum
  • A chain collector bag with increased space requirement is therefore not needed

Downloads